Skip to main content

VIVE Tracker Actor Setup

1. Activate the LED lights and VIVE lighthouses by locating and turning on the surge protector power strip positioned nearest to the window.

IMG_7490.jpgimg-7490.jpg

Before:

IMG_7488.jpgimg-7488.jpg

After:

IMG_7489.jpgimg-7489.jpg

2. Identify the eight VIVE trackers situated in the charging station beneath the table.

IMG_7492.jpgimg-7492.jpg

The set comprises:
        2 hand trackers
        2 upper arm trackers
        1 waist tracker
        1 head tracker
        2 foot trackers  

image.jpgimage.jpg

3. When affixing the trackers to the actor, ensure the LED light on each of the VIVE trackers that form a pair (such as the 2 upper arm trackers) aligns in the same direction as its corresponding device.

IMG_7493.jpgimg-7493.jpg

Refer to the appended images for a visual guide on the appropriate placement of the trackers.

IMG_7497.jpgimg-7497.jpgIMG_7498.jpgimg-7498.jpg

Please note: There are two trackers that lack straps; these are designated for the hands. They will be incorporated in the glove fitting stage. Consequently, the actor should be equipped with all of the trackers, excluding those for the hands.

IMG_7494.jpgimg-7494.jpg